2016-02-07 - 25192 - Spec - Apparel Capacity Planning #materialmaster #ABAPLSMW #ProductionOrders
SPECIFICATIONS
25192-Spec-Apparel Capacity Planning
Purpose
Apparel Capacity Planning
Admin Info
Purpose
|
Apparel Capacity Planning
|
Requested By
|
Josh Creasman
|
Spec Created By
|
Damodhier/Laxman
|
Spec Created Date
|
04/19/2016
|
Spec QA by
|
Damodhier
|
Objects
|
ZMMENGG_MAT
|
Document Status
|
Completed
|
Estimates
Sl.No
|
Activity
|
Estimation in Hours
|
1
|
Research
|
02
|
2
|
Documentation
|
02
|
3
|
Development/ Config
|
06
|
4
|
Unit test in DEV
|
02
|
5
|
Unit test in QUA
|
02
|
6
|
Other activity
|
|
|
TOTAL
|
14
|
References
Prior Tickets
[Provide links of prior associated Spec / Break Fix BOSS document(s)]
Documents
[Attach any document(s) received for the requirement(s)]
Spec Changes
[List the changes made to program after the approval of the original requirement along with the Date on which the change request was received and the name of the initiator]
Sl.
|
Change Details
|
Requested By
|
Requested On
|
Notes if any
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Functional Requirement
Purpose/WHY:
[Explain the purpose of the project and the reason why this requirement has come]
Due to change in the 1410 production process advised to change the labor time in the Routing.
In Scope:
[List the
activities to be included in scope]
Applicable only to apparel materials which are created using Engineering program
Out of Scope:
[Out of scope activities]
Material creation Other than the Engineering Program
Solution Summary
[Discuss this section with Requester and get approval prior to beginning work]
To change the labor time in the routing need to change corresponding LSMW. Details are give below.
LSMW - ENGINEERING - PR-ROUTING - CAPMACHINE
Test Plan
[List test scenarios/cases to be executed here]
Test ID
|
Test Scenario
|
Expected Results
|
MM001
|
Create the material and routing in plant 1410
|
In the routing for operation 20 labor time should be 5.64 MINS
In the routing for operation 30 labor time should be 1.60 MINS
|
Solution Details
[Provide complete technical details for configuration or programming here]
Modified LSMW (ENGINEERING - PR-ROUTING - CAPMACHINE) to set labor time 5.640 Mins for Activity Type 'MI100', 1.600 Mins for Activity Type 'MI400'
Given support to modify the existing routings and to update the corresponding planned orders and production orders.
Issues
[List Issues / Bugs identified in configuration or development]